Thanks to Tim Barlott for bringing this catalog to our attention. It includes reviews and ratings for SMS, geospatial, and remote sensing tools.
Creating Research Capacity through Partnership Development
Showing posts with label low-cost. Show all posts
Showing posts with label low-cost. Show all posts
Wednesday, February 25, 2015
Wednesday, February 19, 2014
Solar Powering the Turnkey FrontlineSMS
The turnkey solution design is such that we want the simple click of the power button to activate a pre-configured system for use. This would be for Freedom Fone, FrontlineSMS, and Ushahidi software applications as per the low cost voice, text-ing, and mapping technologies used in the project, for knowledge mobilization.
In this instance our focus was on testing a FrontlineSMS 1.6.2 installation. It was installed on a 215 x 60 x 190mm 1.5Kg Mini-PC with a Intel Atom dual-core 1.86 GHz processor, 2GB DDR RAM, 8 GB SSD ROM. The Mini-PC draws a 20W load and requires a DC 12V and 5A of power supply.
Recently we tested the turnkey to run on Solar Power. We installed a 165 x 25 x 1.4cm solar panel on top of the RDS office roof in Kaddirweli, Batticaloa district. The panel can generate up to 130W of power. We used a 12V 35A car battery (not the recommended expensive deep cell solar power battery) to store that solar panel generated electricity. A 12V 10A Charger Controller regulates the current between the solar panel, battery, and the load (i.e. Mini-PC).
Since the Charger Controller load connectors deliver 10A and the Mini-PC (load) draws only 5A the surplus 5A would charge the battery. We expect a minimum 6 hours of strong sunlight (see weatheronline for Batticaloa monthly/daily average sunlight). During that the Mini-PC will run on direct solar generated electricity, during day time. The battery would supplement that with another 8 hours during night time, which gives us a total of 14hour, according to our calculation. The next step is testing expected power consumption patterns.
Of cause it is hundred times more economical to consume power through the main grid to simply power the 20W computer, if the infrastructure is available. The solar powered Turnkey's utility is higher when we offer options to power a couple of light bulbs and providing mobile phone charging outlets through the same system. Our thinking is that the Mini-PC does not need to run 24/7. The community can decide to run it at certain hours; thus, there may be a surplus of power to use for other purposes.
We are readying for a campaign in Verugal and Kaddirvelli belonging to the war torn area in the Batticaloa District, Sri Lanka. It will involve farmers from the two villages.
In October 2013, we consulted the two communities during an expedition in determining the information needs. They were particularly interested in trying three activities:
A primary reason to power the Turnkey with Solar energy was because Verugal community does not have access to the main national power grid. We realized that shortcoming, among five others, during our first visit with the community. Nevertheless, a solar powered low-cost ICT system could always be handy during a long power outage, such as one caused by a disaster.
During our field tests we realized that starting up the Turnkey FrontlineSMS should include "auto detecting" the ZTE MF637U and then connecting to the Cellular network Short Message Service.
Unfortunately FrontlineSMS could "auto detect" the dongle. That would have been the final step for a ready to use FrontlineSMS Turnkey solution. Now we are back to the drawing board to figure out how to complete that step. Otherwise, a human operator has to navigate through a computer screen to click the FrontlineSMS "Auto Detect" button.
Yet another iterative community centric development cycle: design, build, test, and re-design. However, development cycles with our low-cost Turnkey text-ing technology is quite promising - being able to fully run a FrontlineSMS installed Mini-PC with a car battery charged by a solar panel.
In this instance our focus was on testing a FrontlineSMS 1.6.2 installation. It was installed on a 215 x 60 x 190mm 1.5Kg Mini-PC with a Intel Atom dual-core 1.86 GHz processor, 2GB DDR RAM, 8 GB SSD ROM. The Mini-PC draws a 20W load and requires a DC 12V and 5A of power supply.
Recently we tested the turnkey to run on Solar Power. We installed a 165 x 25 x 1.4cm solar panel on top of the RDS office roof in Kaddirweli, Batticaloa district. The panel can generate up to 130W of power. We used a 12V 35A car battery (not the recommended expensive deep cell solar power battery) to store that solar panel generated electricity. A 12V 10A Charger Controller regulates the current between the solar panel, battery, and the load (i.e. Mini-PC).
Since the Charger Controller load connectors deliver 10A and the Mini-PC (load) draws only 5A the surplus 5A would charge the battery. We expect a minimum 6 hours of strong sunlight (see weatheronline for Batticaloa monthly/daily average sunlight). During that the Mini-PC will run on direct solar generated electricity, during day time. The battery would supplement that with another 8 hours during night time, which gives us a total of 14hour, according to our calculation. The next step is testing expected power consumption patterns.
Of cause it is hundred times more economical to consume power through the main grid to simply power the 20W computer, if the infrastructure is available. The solar powered Turnkey's utility is higher when we offer options to power a couple of light bulbs and providing mobile phone charging outlets through the same system. Our thinking is that the Mini-PC does not need to run 24/7. The community can decide to run it at certain hours; thus, there may be a surplus of power to use for other purposes.
We are readying for a campaign in Verugal and Kaddirvelli belonging to the war torn area in the Batticaloa District, Sri Lanka. It will involve farmers from the two villages.
In October 2013, we consulted the two communities during an expedition in determining the information needs. They were particularly interested in trying three activities:
- sharing local crop prices
- alerting elephant attacks
- flash flood warnings.
A primary reason to power the Turnkey with Solar energy was because Verugal community does not have access to the main national power grid. We realized that shortcoming, among five others, during our first visit with the community. Nevertheless, a solar powered low-cost ICT system could always be handy during a long power outage, such as one caused by a disaster.
During our field tests we realized that starting up the Turnkey FrontlineSMS should include "auto detecting" the ZTE MF637U and then connecting to the Cellular network Short Message Service.
Unfortunately FrontlineSMS could "auto detect" the dongle. That would have been the final step for a ready to use FrontlineSMS Turnkey solution. Now we are back to the drawing board to figure out how to complete that step. Otherwise, a human operator has to navigate through a computer screen to click the FrontlineSMS "Auto Detect" button.
Yet another iterative community centric development cycle: design, build, test, and re-design. However, development cycles with our low-cost Turnkey text-ing technology is quite promising - being able to fully run a FrontlineSMS installed Mini-PC with a car battery charged by a solar panel.
Monday, September 16, 2013
turnkey enhancements, lessons from sept Kuru-Batti prototyping
From those prototyping and workshop lessons, the points below should be considered for future improvements, in relation to the turnkey solution:
- localized mobile phones - we noticed many farmers to carry phones with keypad and screens in Sinhala and Tamil. It was evident that SMS text from these mobile phones in Sinhala or Tamil would not trigger keyword enabled FrontlineSMS message forwards. Hence, FrontlineSMS would need to be improved to handle those utf-8 characters. Perhaps GUIs may need to be localized as well with features to transliterate with any non-latin scripting language.
- Freedom Fone - must be properly tested in; especially, with the dongles to make it cost-effective. The content upload feature must be simplified by introducing a well developed menu for instructional information.This is a high prioroty because both the Radio stations and the Department of Export Agriculture are keen in using it for localized (Sinhala & Tamil) large vocabulary continuous speech (descriptive) messaging to campaign with farmers.
- Bundle Ushahidi - would mean to include Ushahidi with FreedomFone and FrontlineSMS boxes. Ushahidi instance should function as a local-host with fixed maps. Ushahidi and Freedom Fone (exceptional to FrontlineSMS 2.0) should be accessible through the Mini-PC wifi with the Mini-PC serving as a localhost.
- Solar charger - farmers in Vakarai live on in the farm lands that are 10 - 20 KM away from their homes. They carry two batteries and charge the dead batteries when they go to town or visit home. We need to design a solar powered battery that can power the 20 Watt Mini-PC for daily use over 12 hours and an additional 5 Watts that can be used to charge phones when that capacity is not used to power the Monitor or other add-ons.
- Grab-n-Go Box - Although all the equipment can be easily fit in a tiny back-pack; it is ideal to fit them all in to a tool box type plastic container for easy-of-use and rapid operationalization.
Saturday, June 15, 2013
Mini-PCs to surve as low-cost Turnkey Mapping, Text-ing, and Interactive Voice Servers
The image on the left is a low hardware configuration PC (personal computer). It is capable of functioning in the capacity of a Server serving 2-5 simultaneous users. This is not a restriction on the number users on an application, rather it is a restriction on the number of web sessions such as more than 5 administrators accessing Freedom Fone to configure it. The box comes in two flavours: Windows and Linux.
We have tested it to serve as a FrontlineSMS, Ushahidi, and Freedom Fone host. A dongle or mobile phone can be connected to one of the USB ports to get FrontlineSMS activated. A mobigator modem or Freedom Fone recommended dongles can be connected to the USB to get the interactive voice solution activated. Ushahidi can be installed with a Static IP (e.g. 192.168.2.200/ushahidi) for anyone to access within a LAN by connecting through Mini-PCs WiFi. The box does have a RJ45 port to connect to a WAN or the Internet to function outside the local area.
We have tested it to serve as a FrontlineSMS, Ushahidi, and Freedom Fone host. A dongle or mobile phone can be connected to one of the USB ports to get FrontlineSMS activated. A mobigator modem or Freedom Fone recommended dongles can be connected to the USB to get the interactive voice solution activated. Ushahidi can be installed with a Static IP (e.g. 192.168.2.200/ushahidi) for anyone to access within a LAN by connecting through Mini-PCs WiFi. The box does have a RJ45 port to connect to a WAN or the Internet to function outside the local area.
- The beauty of it is that one can install FrontlineSMS for text-ing, Ushahidi for mapping, and Freedom Fone for interactive voice solutions, configure it, plug it in and let it run.
- It is small enough to squeeze inside a table drawer and lock it away; while it runs.
- The device has an area the same or less than the face area of a 10" tablet PC but about 5 times thicker than a tablet PC; nevertheless fits in the palm; like a think notebook.
- It is cheap; a high end configuration would cost less than US$ 130.00 and a low-end configuration would cost around US$ 80.00.
- Unlike a laptop or notebook it does carry an expensive LCD screen because the screen is unnecessary for a server.
- If the data storage needs to be expanded, the best option is attaching a 1-TB external hard drive(~US$80).
- Administrators or implementers can access the applications through the Wi-Fi (or a cross cable connected to the RJ45 socket) using tools such as "remote desktop", "team-viewer", SSH, so on and so forth; that is not hard.
- A laptop consumes approximate 35-40W of energy and a desktop PC about the same; while the Mini-PC consumes 15-20W; making it relatively greener.
- We would have a couple of these units pre-installed and configured; possibly a windows box for FrontlineSMS and a Linux box for Freedom Fone; while Ushahidi could work on either one of them or both
- At the onset of the meeting with the community, in a remote location, we can quickly initiate an instance or the 3 applications, by simply powering it up; then connecting to is through our laptops.
- Then while interacting with the community determining their communication needs, implement those requirements to test it with them
- Finally, leave the unit with them for several weeks for them to test their implementation; i.e. play with it.
Subscribe to:
Posts (Atom)

